We worked with a company with operations in Mississippi on the controls architecture, design and build for their first sawmill. Podium completed a design and build in less than 4 weeks for a high-voltage panel and low-voltage panel, separating the large VFDs from the PLC and connection points for sensors. This allowed us to concentrate all 480V in the high voltage panel, reducing the risk of EMI and arc flash.